The newly installed reverse-power protection device at the Wuliangye Nanshan Station has been re-designated in the engineering comparison announcement for the Jiusheng Station.
Notice of Bid Winning Results (Disposal of One Electric Double-Beam Bridge Crane)
Notice of Bid Winning Results (Disposal of One Electric Double-Beam Bridge Crane)
Notice on the Disposal of Electric Double-Beam Bridge Cranes
Notice of Invitation to the Winning Bidder in the Competitive Selection—Logistics Services Project
Notice of Invitation to the Winning Bidder in the Competitive Selection—Logistics Services Project
Notice of Bid Results for the Procurement Project of Non-Standard Components for Generator Sets (Part III)
Announcement of Winning Bid for the Procurement Project of Non-Standard Components for Generator Sets (Part II)
Announcement of Winning Bids for the Procurement Project of Non-Standard Components for Generator Sets (Part 1)
Public Tender Notice for the Procurement of Non-Standard Components for Generator Sets—Chongqing Push New Energy Technology Co., Ltd. (Second Round)
Announcement on the Prequalification Results for Bidding on Non-Standard Components for Generator Sets
Guizhou Hongdawa Power Station Generation Project
Construction capacity: 6 MW, connected to the national grid. Combined heat and power (CHP) system. Gas source: Low-concentration coalbed methane (methane concentration ≥ 8%). Unit rated power: 1500 kW.
Guizhou Hongfa Gas Power Plant Generation Project
Construction capacity: 6.4 MW, connected to the national power grid. Gas source: Low-concentration coal mine gas (methane concentration ≥ 8%). Unit rated power: 700 kW, 840 kW, 1200 kW.