News

Environmental Information Disclosure Form of Chongqing Push Machinery Co., Ltd.

Release time:

2018-12-19 19:20

Author:

Chongqing Push Machinery Co., Ltd. – Environmental Information Disclosure Form Basic Information of the Entity Entity Name: Chongqing Push Machinery Co., Ltd. Organization Code: 91500107676137584L Address: No. 3 Huacheng Road, Area B, Jiulong Garden, Jiulongpo District, Chongqing City Geographic Location: 106°27′ East Longitude, 29°29′ North Latitude Legal Representative: Wang Kangsheng Contact Telephone: 023-86175976 Environmental Protection Officer: Cui Richu Contact Telephone: 13983385605 Industry Category: Manufacturing of Internal Combustion Engines and Accessories – C3512 Postal Code: 400052 Production Cycle: 252 days Email Address: 261

   Chongqing Push Machinery Co., Ltd. Environmental Information Disclosure Table

Basic Information of the Unit

Unit Name

Chongqing Push Machinery Co., Ltd.

Organization Code

91500107676137584L

Unit address

No. 3 Huacheng Road, Area B, Jiulong Garden, Jiulongpo District, Chongqing City

Geographic location

East longitude 106 degree 27 Share , North Latitude 29 degree 29 Share

Legal Representative

Wang Kangsheng

Contact phone number

023-86175976

Environmental Protection Officer

Choi Il-chul

Contact phone number

13983385605

Industry Category

Internal Combustion Engine and Parts Manufacturing C3512

Postal code

400052

Production cycle

252 days

Email address

261149299@qq.com

Introduction to the Unit

Chongqing Push Machinery Co., Ltd. was established in July 2008. Its main products are high-power engines (and engine sets). The company is designed to produce 200 high-power engines per year, and it passed the environmental acceptance inspection conducted by the Jiulongpo District Environmental Protection Bureau in October 2011.

Pollution Source Management Level

District Control

 

Wastewater Discharge Information

Waste Water Discharge outlet Name, number, Location

The wastewater treatment plant discharge outlet, JLWSG0054001, is located at the southwest corner of the factory premises.

Water pollutants Name

Regulated emission limits

Actual emission concentration

Total control indicators

Emission standards being implemented

Integrated Wastewater Discharge Standard (GB8978-1996), Table 4, Class I Standard

Cash on Delivery

≤100 mg/L

15 mg/L,

3.6 t/a

Characteristic water pollutants

COD, SS, Ammonia Nitrogen, Petroleum Hydrocarbons, Anionic Surfactants

SS

≤70 mg/L

8 mg/L,

2.52 t/a

Approved annual total wastewater discharge

36000t/a

Ammonia nitrogen

≤15 mg/L

1.36 mg/L

0.54 t/a

Actual annual total wastewater discharge

36000t/a

Petroleum-based

≤5 mg/L

0.68mg/L

0.18t/a

Emission method and Emission destination

Intermittent stable discharge into the municipal pipeline network of the Kowloon Park Industrial Zone.

Anionic surfactant

≤5 mg/L,

0.11 mg/L,

0.18 t/a

 

Exhaust Emission Information

Waste air Discharge outlet Name, number, Location

Exhaust outlet of Test Room No. 2; JLFQG0054002; Northwest Engine Test Room No. 2 on the plant site

Atmosphere Pollutant Name

Regulated emission limits

Actual emission concentration

Total control indicators

Emission standards being implemented

Comprehensive Emission Standards for Air Pollutants in Chongqing Municipality (Table 7 of DB50/418-2012)

SO2

≤200 mg/m³

36.3mg/m3

≤0. 008t/a

Emission method and Emission destination

After collection, the emissions are regularly and continuously discharged in a concentrated manner from a 25-meter-high chimney.

Nitrogen oxides

≤200 mg/m³

57.33mg/m3

≤0. 013t/a

Feature Atmosphere Pollutant

SO2, nitrogen oxides

/

/

/

/

Waste air Discharge outlet Name, number, Location

Exhaust outlet of the complete-machine spray and baking chamber; JLFQG0054003, JLFQG0054004; Complete-machine spray and baking chamber in the northwest area of the plant.

Atmosphere Pollutant Name

Regulated emission limits

Actual emission concentration

Total control indicators

Emission standards being implemented

Table 2, Level 2, of the “Comprehensive Emission Standard for Air Pollutants” (GB16297-1996)

Toluene

≤40 mg/m³

0.087mg/m3

≤0. 0008t/a

Emission method and Emission destination

After collection, the emissions are regularly and continuously discharged in a concentrated manner from a 15-meter-high chimney.

Xylene

≤70 mg/m³

0.829mg/m3

≤0. 0001t/a

Feature Atmosphere Pollutant

Toluene, xylene

/

/

/

/

 

Noise Emission Information

Emission standards being implemented

Class 2 Standard of the "Environmental Noise Emission Standard for Industrial Enterprises' Plant Boundaries" (GB12348-2008)

Regulated emission limits

Daytime ≤ 65 decibels

Emission method

Regular intermittent discharge

Actual monitored values

During the day 57.8 decibel

 

Solid (Hazardous) Waste Discharge Information

Solid (Hazardous) Name

Solid waste category

Hazardous waste code

Generation amount

Transfer amount

Storage quantity

Disposal or recycling status

Waste mineral oil

Hazardous waste

HW 08

3.2 tons/year

3 2 tons/year

0

Hand over to Chongqing Tianzhi Environmental Protection for processing.

Empty paint buckets

Hazardous waste

HW49

0.13 tons/year

0.13 tons/year

0

Hand over to Chongqing Tianzhi Environmental Protection for processing.

Waste cutting fluid

Hazardous waste

HW09

3.7 tons/year

3.7 tons/year

0

Hand over to Chongqing Tianzhi Environmental Protection for processing.

 

Environmental Monitoring Information

Monitoring method

Entrusted monitoring

Entrustment Monitoring Agency Name

Chongqing Tianjian Environmental Monitoring Co., Ltd.

Monitoring Station Map

See Attachment 1.

Handheld monitoring result data

See Attachment 2.

 

Construction and Operation Information for Water Pollution Control Facilities

Name of Governance Facility

Commissioning date

Processing technology

Design processing capacity

Actual processing volume

Runtime

Operating status

Wastewater Treatment Plant

October 2011

Anaerobic biochemical + Aerobic biochemical

300 tons/day

65 tons/day

6 hours/day

Normal

 

Construction and Operation Information for Wastewater Pollution Control Facilities

Name of Governance Facility

Commissioning date

Processing technology

Design processing capacity

Actual processing volume

Runtime

Operating status

Toluene absorption unit

October 2011

Filter cotton and activated carbon adsorption, discharged via a 15-meter-high exhaust stack.

100,000 cubic meters per hour

42,800 cubic meters per hour

1 hour/day

Normal

 

Construction and Operation Information for Noise Pollution Control Facilities

Name of Governance Facility

Commissioning date

Processing technology

Design processing capacity

Actual processing volume

Runtime

Operating status

  Soundproofing and noise-reducing wall

  October 2011

Partitioned shielding, enclosed and soundproof operation

  Reduce by 20 decibels

  Reduce by 15 decibels

2 hours/day

  Normal

 

Environmental Impact Assessment and Other Administrative Permit Information

Administrative Permit Name

Project file name

Making or Approving Entity

Document number

Content Description

Project Environmental Impact Assessment Report

Push (Chongqing) High-Power Marine Diesel Engine Assembly and Stamping Integrated Production Line Project

Chongqing Ningling Environmental Protection Technology Development Co., Ltd.

Date of preparation: July 2009

Due to the large file size, those who need it should contact the relevant unit.

Provide a copy upon request.

Environmental Impact Assessment Report Approval Document

Approval Letter for the Environmental Impact Assessment Document of the “Push (Chongqing) High-Power Marine Diesel Engine Assembly and Stamping Integrated Production Line Project”

Jiulongpo District Environmental Protection Bureau

  Yu (Jiu) Huan Jun [200 9]88 Number

See Attachment 3

Acceptance Opinion for Governance Facilities

Approval for the Completion Environmental Protection Acceptance of the “Push (Chongqing) High-Power Marine Diesel Engine Assembly and Stamping Integrated Production Line Project”

Jiulongpo District Environmental Protection Bureau

Yu (Jiu) Ring Verification [20 11]05 Number 8

See Attachment 4

Discharge Permit

Chongqing Municipality Emission Permit for Pollutants

Jiulongpo District Environmental Protection Agency

  Yu (Jiu) Huan Pai Zheng [2018] No. 0586

See Attachment 5

 

Emergency Information for Environmental Emergencies

Emergency Response Plan for Sudden Environmental Incidents

Emergency Response Plan for Sudden Environmental Incidents of Chongqing Push Machinery Co., Ltd. (see Appendix 6)

Environmental Risk Assessment Status

None

Status of Environmental Risk Prevention Work

Properly respond to localized or regional environmental pollution incidents caused by sudden environmental pollution, ecological damage, and other similar factors, ensuring that on-site emergency response and handling can be carried out swiftly and effectively when such incidents occur, thereby protecting the safety of life and property of personnel in the plant area, surrounding environment, and residential areas, and preventing sudden environmental pollution accidents.

Incident and Response Status of Sudden Environmental Events

Currently No sudden environmental incidents.

Implementation of rectification requirements

The company conducts emergency response drills for sudden environmental incidents at least once a year. The drills are planned and prepared according to the requirements of the emergency plan, with scenarios primarily focusing on accidents involving hazardous chemicals (such as leaks and fires), hazardous waste incidents (such as leaks and fires), and accidents at wastewater treatment plants (such as emergency water or power outages). The drills are carried out strictly in accordance with the prepared plans.

 

Environmental Certification Information

Certification Program Name

Certifying Entity

Certification Time

Certification Result

Certificate document number

ISO14001 Environmental Management System Certification

China Classification Society Quality Certification Company

June 2018 (most recent)

Through

Certificate Number: 00511E21051R0M (see Attachment 7)

 

Other environmental information

Payment of pollution discharge fees

When applying for a pollution discharge permit, I purchased emission rights and paid the pollution discharge tax on time.

Performance of social responsibility

The company strictly complies with environmental protection laws and regulations, continuously improving its pollutant disposal processes and facilities through technological upgrades and innovations, thereby reducing pollutant emissions.

Environmental Policy, Annual Environmental Goals, and Performance Outcomes

Environmental Protection Policy: Clean Production, Energy Conservation and Consumption Reduction, Green Economy.

Annual Environmental Protection Goals and Achievements: Implement the environmental protection responsibility system, promote the normalization of environmental management, and ensure the proper operation of environmental protection facilities. There were zero incidents of various types of environmental pollution; the compliance rate for the discharge of “three wastes” (water, air, and noise) reached 100%; and the collection and disposal rates for hazardous waste, in accordance with regulations, also reached 100%.

Environmental Investment and Environmental Technology Development Status

Building on its existing environmental protection equipment, the company invested over 100,000 yuan in 2012 to upgrade its hazardous waste storage and collection facility, and in 2015, it invested over 200,000 yuan to replace and modernize its aging wastewater treatment facilities.

Recycling status of waste products

None

Total annual resource consumption

Water: 42,515 tons per year; Electricity: 10.56 million kilowatt-hours per year; Natural gas: 106,778 cubic meters per year.

Annual Environmental Violation Status

None

Annual Environmental Awards Status

None

 

 

16

2026

-

06

Public Competitive Consultation Announcement (Third Round) for the Research and Development and Design of High-Power, Medium-Speed V-Type Gas Engines by Chongqing Push New Energy Technology Co., Ltd.

Public Competitive Consultation Announcement (Third Round) for the Research and Development and Design of High-Power, Medium-Speed V-Type Gas Engines by Chongqing Push New Energy Technology Co., Ltd.

26

2026

-

01

Public Notice of Shortlisted Candidates for the 10kV Renovation Project at Jiusheng Station in the New Wastewater Centralized Treatment Project of Wuliangye Environmental Industry Company

Project Name: 10kV Renovation Project for the Jiusheng Station of the New Wastewater Centralized Treatment Project of Wuliangye Environmental Protection Industry Company

12

2026

-

01

Notice of Competitive Selection for the 10kV Renovation Project at Jiusheng Station—New Wastewater Centralized Treatment Project of Wuliangye Environmental Protection Industry Company

The 10kV renovation project for the Jiusheng Station of the newly built centralized wastewater treatment facility of Wuliangye Environmental Protection Industry Company is now ready for procurement. The procuring entity for this project is Chongqing Push New Energy Technology Co., Ltd.