Environmental Information Disclosure Form of Chongqing Push Machinery Co., Ltd.
Release time:
2018-12-19 19:20
Author:
Chongqing Push Machinery Co., Ltd. – Environmental Information Disclosure Form Basic Information of the Entity Entity Name: Chongqing Push Machinery Co., Ltd. Organization Code: 91500107676137584L Address: No. 3 Huacheng Road, Area B, Jiulong Garden, Jiulongpo District, Chongqing City Geographic Location: 106°27′ East Longitude, 29°29′ North Latitude Legal Representative: Wang Kangsheng Contact Telephone: 023-86175976 Environmental Protection Officer: Cui Richu Contact Telephone: 13983385605 Industry Category: Manufacturing of Internal Combustion Engines and Accessories – C3512 Postal Code: 400052 Production Cycle: 252 days Email Address: 261
Chongqing Push Machinery Co., Ltd. Environmental Information Disclosure Table
Basic Information of the Unit
|
Unit Name |
Chongqing Push Machinery Co., Ltd. |
Organization Code |
91500107676137584L |
|
Unit address |
No. 3 Huacheng Road, Area B, Jiulong Garden, Jiulongpo District, Chongqing City |
Geographic location |
East longitude 106 degree 27 Share , North Latitude 29 degree 29 Share |
|
Legal Representative |
Wang Kangsheng |
Contact phone number |
023-86175976 |
|
Environmental Protection Officer |
Choi Il-chul |
Contact phone number |
13983385605 |
|
Industry Category |
Internal Combustion Engine and Parts Manufacturing C3512 |
Postal code |
400052 |
|
Production cycle |
252 days |
Email address |
261149299@qq.com |
|
Introduction to the Unit |
Chongqing Push Machinery Co., Ltd. was established in July 2008. Its main products are high-power engines (and engine sets). The company is designed to produce 200 high-power engines per year, and it passed the environmental acceptance inspection conducted by the Jiulongpo District Environmental Protection Bureau in October 2011. |
Pollution Source Management Level |
District Control |
Wastewater Discharge Information
|
Waste Water Discharge outlet Name, number, Location |
The wastewater treatment plant discharge outlet, JLWSG0054001, is located at the southwest corner of the factory premises. |
Water pollutants Name |
Regulated emission limits |
Actual emission concentration |
Total control indicators |
|
Emission standards being implemented |
Integrated Wastewater Discharge Standard (GB8978-1996), Table 4, Class I Standard |
Cash on Delivery |
≤100 mg/L |
15 mg/L, |
3.6 t/a |
|
Characteristic water pollutants |
COD, SS, Ammonia Nitrogen, Petroleum Hydrocarbons, Anionic Surfactants |
SS |
≤70 mg/L |
8 mg/L, |
2.52 t/a |
|
Approved annual total wastewater discharge |
36000t/a |
Ammonia nitrogen |
≤15 mg/L |
1.36 mg/L |
0.54 t/a |
|
Actual annual total wastewater discharge |
36000t/a |
Petroleum-based |
≤5 mg/L |
0.68mg/L |
0.18t/a |
|
Emission method and Emission destination |
Intermittent stable discharge into the municipal pipeline network of the Kowloon Park Industrial Zone. |
Anionic surfactant |
≤5 mg/L, |
0.11 mg/L, |
0.18 t/a |
Exhaust Emission Information
|
Waste air Discharge outlet Name, number, Location |
Exhaust outlet of Test Room No. 2; JLFQG0054002; Northwest Engine Test Room No. 2 on the plant site |
Atmosphere Pollutant Name |
Regulated emission limits |
Actual emission concentration |
Total control indicators |
|
Emission standards being implemented |
Comprehensive Emission Standards for Air Pollutants in Chongqing Municipality (Table 7 of DB50/418-2012) |
SO2 |
≤200 mg/m³ |
36.3mg/m3 |
≤0. 008t/a |
|
Emission method and Emission destination |
After collection, the emissions are regularly and continuously discharged in a concentrated manner from a 25-meter-high chimney. |
Nitrogen oxides |
≤200 mg/m³ |
57.33mg/m3 |
≤0. 013t/a |
|
Feature Atmosphere Pollutant |
SO2, nitrogen oxides |
/ |
/ |
/ |
/ |
|
Waste air Discharge outlet Name, number, Location |
Exhaust outlet of the complete-machine spray and baking chamber; JLFQG0054003, JLFQG0054004; Complete-machine spray and baking chamber in the northwest area of the plant. |
Atmosphere Pollutant Name |
Regulated emission limits |
Actual emission concentration |
Total control indicators |
|
Emission standards being implemented |
Table 2, Level 2, of the “Comprehensive Emission Standard for Air Pollutants” (GB16297-1996) |
Toluene |
≤40 mg/m³ |
0.087mg/m3 |
≤0. 0008t/a |
|
Emission method and Emission destination |
After collection, the emissions are regularly and continuously discharged in a concentrated manner from a 15-meter-high chimney. |
Xylene |
≤70 mg/m³ |
0.829mg/m3 |
≤0. 0001t/a |
|
Feature Atmosphere Pollutant |
Toluene, xylene |
/ |
/ |
/ |
/ |
Noise Emission Information
|
Emission standards being implemented |
Class 2 Standard of the "Environmental Noise Emission Standard for Industrial Enterprises' Plant Boundaries" (GB12348-2008) |
Regulated emission limits |
Daytime ≤ 65 decibels |
|
Emission method |
Regular intermittent discharge |
Actual monitored values |
During the day 57.8 decibel |
Solid (Hazardous) Waste Discharge Information
|
Solid (Hazardous) Name |
Solid waste category |
Hazardous waste code |
Generation amount |
Transfer amount |
Storage quantity |
Disposal or recycling status |
|
Waste mineral oil |
Hazardous waste |
HW 08 |
3.2 tons/year |
3 2 tons/year |
0 |
Hand over to Chongqing Tianzhi Environmental Protection for processing. |
|
Empty paint buckets |
Hazardous waste |
HW49 |
0.13 tons/year |
0.13 tons/year |
0 |
Hand over to Chongqing Tianzhi Environmental Protection for processing. |
|
Waste cutting fluid |
Hazardous waste |
HW09 |
3.7 tons/year |
3.7 tons/year |
0 |
Hand over to Chongqing Tianzhi Environmental Protection for processing. |
Environmental Monitoring Information
|
Monitoring method |
Entrusted monitoring |
Entrustment Monitoring Agency Name |
Chongqing Tianjian Environmental Monitoring Co., Ltd. |
|
Monitoring Station Map |
See Attachment 1. |
Handheld monitoring result data |
See Attachment 2. |
Construction and Operation Information for Water Pollution Control Facilities
|
Name of Governance Facility |
Commissioning date |
Processing technology |
Design processing capacity |
Actual processing volume |
Runtime |
Operating status |
|
Wastewater Treatment Plant |
October 2011 |
Anaerobic biochemical + Aerobic biochemical |
300 tons/day |
65 tons/day |
6 hours/day |
Normal |
Construction and Operation Information for Wastewater Pollution Control Facilities
|
Name of Governance Facility |
Commissioning date |
Processing technology |
Design processing capacity |
Actual processing volume |
Runtime |
Operating status |
|
Toluene absorption unit |
October 2011 |
Filter cotton and activated carbon adsorption, discharged via a 15-meter-high exhaust stack. |
100,000 cubic meters per hour |
42,800 cubic meters per hour |
1 hour/day |
Normal |
Construction and Operation Information for Noise Pollution Control Facilities
|
Name of Governance Facility |
Commissioning date |
Processing technology |
Design processing capacity |
Actual processing volume |
Runtime |
Operating status |
|
Soundproofing and noise-reducing wall |
October 2011 |
Partitioned shielding, enclosed and soundproof operation |
Reduce by 20 decibels |
Reduce by 15 decibels |
2 hours/day |
Normal |
Environmental Impact Assessment and Other Administrative Permit Information
|
Administrative Permit Name |
Project file name |
Making or Approving Entity |
Document number |
Content Description |
|
Project Environmental Impact Assessment Report |
Push (Chongqing) High-Power Marine Diesel Engine Assembly and Stamping Integrated Production Line Project |
Chongqing Ningling Environmental Protection Technology Development Co., Ltd. |
Date of preparation: July 2009 |
Due to the large file size, those who need it should contact the relevant unit. Provide a copy upon request. |
|
Environmental Impact Assessment Report Approval Document |
Approval Letter for the Environmental Impact Assessment Document of the “Push (Chongqing) High-Power Marine Diesel Engine Assembly and Stamping Integrated Production Line Project” |
Jiulongpo District Environmental Protection Bureau |
Yu (Jiu) Huan Jun [200 9]88 Number |
See Attachment 3 |
|
Acceptance Opinion for Governance Facilities |
Approval for the Completion Environmental Protection Acceptance of the “Push (Chongqing) High-Power Marine Diesel Engine Assembly and Stamping Integrated Production Line Project” |
Jiulongpo District Environmental Protection Bureau |
Yu (Jiu) Ring Verification [20 11]05 Number 8 |
See Attachment 4 |
|
Discharge Permit |
Chongqing Municipality Emission Permit for Pollutants |
Jiulongpo District Environmental Protection Agency |
Yu (Jiu) Huan Pai Zheng [2018] No. 0586 |
See Attachment 5 |
Emergency Information for Environmental Emergencies
|
Emergency Response Plan for Sudden Environmental Incidents |
Emergency Response Plan for Sudden Environmental Incidents of Chongqing Push Machinery Co., Ltd. (see Appendix 6) |
|
Environmental Risk Assessment Status |
None |
|
Status of Environmental Risk Prevention Work |
Properly respond to localized or regional environmental pollution incidents caused by sudden environmental pollution, ecological damage, and other similar factors, ensuring that on-site emergency response and handling can be carried out swiftly and effectively when such incidents occur, thereby protecting the safety of life and property of personnel in the plant area, surrounding environment, and residential areas, and preventing sudden environmental pollution accidents. |
|
Incident and Response Status of Sudden Environmental Events |
Currently No sudden environmental incidents. |
|
Implementation of rectification requirements |
The company conducts emergency response drills for sudden environmental incidents at least once a year. The drills are planned and prepared according to the requirements of the emergency plan, with scenarios primarily focusing on accidents involving hazardous chemicals (such as leaks and fires), hazardous waste incidents (such as leaks and fires), and accidents at wastewater treatment plants (such as emergency water or power outages). The drills are carried out strictly in accordance with the prepared plans. |
Environmental Certification Information
|
Certification Program Name |
Certifying Entity |
Certification Time |
Certification Result |
Certificate document number |
|
ISO14001 Environmental Management System Certification |
China Classification Society Quality Certification Company |
June 2018 (most recent) |
Through |
Certificate Number: 00511E21051R0M (see Attachment 7) |
Other environmental information
|
Payment of pollution discharge fees |
When applying for a pollution discharge permit, I purchased emission rights and paid the pollution discharge tax on time. |
|
Performance of social responsibility |
The company strictly complies with environmental protection laws and regulations, continuously improving its pollutant disposal processes and facilities through technological upgrades and innovations, thereby reducing pollutant emissions. |
|
Environmental Policy, Annual Environmental Goals, and Performance Outcomes |
Environmental Protection Policy: Clean Production, Energy Conservation and Consumption Reduction, Green Economy. Annual Environmental Protection Goals and Achievements: Implement the environmental protection responsibility system, promote the normalization of environmental management, and ensure the proper operation of environmental protection facilities. There were zero incidents of various types of environmental pollution; the compliance rate for the discharge of “three wastes” (water, air, and noise) reached 100%; and the collection and disposal rates for hazardous waste, in accordance with regulations, also reached 100%. |
|
Environmental Investment and Environmental Technology Development Status |
Building on its existing environmental protection equipment, the company invested over 100,000 yuan in 2012 to upgrade its hazardous waste storage and collection facility, and in 2015, it invested over 200,000 yuan to replace and modernize its aging wastewater treatment facilities. |
|
Recycling status of waste products |
None |
|
Total annual resource consumption |
Water: 42,515 tons per year; Electricity: 10.56 million kilowatt-hours per year; Natural gas: 106,778 cubic meters per year. |
|
Annual Environmental Violation Status |
None |
|
Annual Environmental Awards Status |
None |
16
2026
-
06
Public Competitive Consultation Announcement (Third Round) for the Research and Development and Design of High-Power, Medium-Speed V-Type Gas Engines by Chongqing Push New Energy Technology Co., Ltd.
26
2026
-
01
Project Name: 10kV Renovation Project for the Jiusheng Station of the New Wastewater Centralized Treatment Project of Wuliangye Environmental Protection Industry Company
12
2026
-
01
The 10kV renovation project for the Jiusheng Station of the newly built centralized wastewater treatment facility of Wuliangye Environmental Protection Industry Company is now ready for procurement. The procuring entity for this project is Chongqing Push New Energy Technology Co., Ltd.